Lewisville Park & Streetscape

WorkTalley Associates · Lewisville, Texas

Lewisville Park & Streetscape

A streetscape, a trail and a pond boardwalk on Summit Avenue in Lewisville, Texas

Illustrative masterplan of the Summit Avenue streetscape and park: the tree-lined avenue, the trail through the meadow and the wooded channel, and the pond with its boardwalk, among the planned housing
The final illustrative masterplan: the Summit Avenue streetscape, the trail through the meadow under the power lines, and the boardwalk at the pond
The final illustrative masterplan: the Summit Avenue streetscape, the trail through the meadow under the power lines, and the boardwalk at the pond

Project snapshot

My contribution

Role

Urban designer at Talley Associates: sketched layout iterations by hand, and modeled and rendered the site

With

Talley Associates’ design team, which presented the masterplan

Tools

Hand sketching • Rhino 3D • Lumion • Photoshop

Project details

Location
Lewisville, Texas
Firm
Talley Associates, Dallas
Clients
City of Lewisville and the developer
Project type
Streetscape, trail and park
Phase
Concept design
Year
2019

00 Overview

In 2019, as an urban designer at Talley Associates, I worked on the concept design of a streetscape, a trail and a park on Summit Avenue in Lewisville, Texas.

I sketched a range of layouts to meet the vision and requirements of the city and the developer, and our team presented a masterplan. I also modeled the site and rendered it for stakeholders.

01 Design iterations

Layouts by hand

My sketch iterations worked out the layout of the project’s three parts: a streetscape spine along Summit Avenue, a trail along a power-line easement and a boardwalk at a pond, each with a character of its own.

FIG. 01Four of the sketch iterations, in pen and marker over printed plans of the site

02 Concept presentation

The site, its systems and the street

Our team presented the concept on February 25, 2019, with sheets on the site as it was, its natural systems and circulation, and a typical section of Summit Avenue.

FIG. 02The site before design
Natural systems: meadow and wildflower mix, riparian buffer, the constructed water channel, wetland, the lake and preserved vegetation
Natural systems
Circulation: the trail, sidewalks, the boardwalk and vehicular routes, with bridges and view platforms
Circulation
FIG. 03The masterplan read as two systems
FIG. 04Summit Avenue in section

03 3D modeling & rendering

The park at eye level

To show stakeholders the park’s character, I modeled the site in Rhino 3D and rendered views of it in Lumion and Photoshop.

Rendering: people on a timber boardwalk above the reeds at the pond’s edge, an interpretive sign at the rail and a transmission tower beyond
The boardwalk at the pond
FIG. 05The boardwalk at the pond
Rendering: a tree-lined sidewalk between Summit Avenue and the pond, with stepping blocks set in the reeds at the water
The sidewalk along the water
Rendering: stone terraces stepping into the pond beside the avenue, a man fishing from them
Stone terraces at the water’s edge
FIG. 06Where Summit Avenue meets the pond
Rendering: a cyclist and a runner on a gravel trail through meadow planting, a transmission tower beyond
Through the meadow
Rendering: a paved trail entrance off the street, with a trail map sign, stone seating and planting, the meadow and a transmission tower beyond
A trail entrance off the street
FIG. 07The trail along the power-line easement
Rendering: a couple on a loop walk around an oval lawn beside the street, with the planned apartment blocks and their parking behind
The park beside the planned apartments